Chappy’s Safari Lounge was established in 1999. Property is a concrete building; after the 2008 flood the building was stripped down to the concrete and started over with new wiring, finished walls, new walk-in freezer and cooler, bar, tap lines, Kitchen equipment and stainless steel. Other improvements: Gable roof w/asphalt shingles; Roof top HVAC 2019; Make up Air 2020; On demand hot water heater 2020. Lower level basement for storage. Reach out to me for more information or click in the attachment for additional information.
Chappy’s Safari Lounge was established in 1999. Property is a concrete building; after the 2008 flood the building was stripped down to the concrete and started over with new wiring, finished walls, new walk-in freezer and cooler, bar, tap lines, Kitchen equipment and stainless steel. Other improvements: Gable roof w/asphalt shingles; Roof top HVAC 2019; Make up Air 2020; On demand hot water heater 2020. Lower level basement for storage. Reach out to me for more information or click in the attachment for additional information.