This lot will be re-engineered and include the storage garage garages that sit in the back of the lot. Storage garages have been used for personal use and never rented. no P &L. There are 8 units per assessor site garages building is 98X 24. this will add approx 2,300 sq feet to the existing lot 31 Final plat and use must be approved before closing, seller reserves the right to use the units for 60 days after closing. The street will be started in May 2024 and utilities will be brought to lot
This lot will be re-engineered and include the storage garage garages that sit in the back of the lot. Storage garages have been used for personal use and never rented. no P &L. There are 8 units per assessor site garages building is 98X 24. this will add approx 2,300 sq feet to the existing lot 31 Final plat and use must be approved before closing, seller reserves the right to use the units for 60 days after closing. The street will be started in May 2024 and utilities will be brought to lot